Violation Detail
Standard Cited: 19260403 B02 General requirements.
Inspection Nr: 1269327.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 04/10/2018 4
Initial Penalty: $9,239.00
Current Penalty: $9,239.00
Issuance Date: 03/15/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0830300
Contest Date: 03/30/2018
Final Order: 10/01/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | W: Empr Withdrew | 10/01/2019 | $9,239.00 | 04/10/2018 | Serious | |
Penalty | C: Contested | 04/04/2018 | $9,239.00 | 04/10/2018 | Serious | |
Penalty | Z: Issued | 03/15/2018 | $9,239.00 | 04/10/2018 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: (a) On or about October 3, 2017 for the employees exposed to electrical shock hazards where two portable Honda EU2000 generators were sitting in water while running water pumps in the vicinity of First Street SW and Troy Avenue Tappen, ND.