Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1269306.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,959.00
Current Penalty: $6,000.00
Issuance Date: 11/02/2017
Nr Instances: 6
Nr Exposed: 9
Related Event Code (REC): A;R
Gravity: 5
Report ID: 0523300
Contest Date:
Final Order: 11/16/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/16/2017 | $6,000.00 | Serious | ||
Penalty | Z: Issued | 11/02/2017 | $9,959.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. On or about September 29, 2017, energy control procedures or any other methods such as but not limited to machine guarding were not utilized during the adjustment of the core rod height on the Elmco 125 ton press(s).