Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1267353.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $8,315.00
Current Penalty: $5,820.50
Issuance Date: 03/20/2018
Nr Instances: 2
Nr Exposed: 12
Related Event Code (REC): C;I
Gravity: 5
Report ID: 0214500
Contest Date: 04/12/2018
Final Order: 10/17/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/17/2019 | $5,820.50 | Serious | ||
Penalty | C: Contested | 06/13/2018 | $8,315.00 | Serious | ||
Penalty | Z: Issued | 03/20/2018 | $8,315.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) East Exit #3: The Exit Door had a panic bar and a turn knob lock that was kept in the locked position during the 2nd and 3rd shifts, on or about 10/2/17. b) Glass Door Main Lobby: The Exit Door could only be opened by pushing a small green button located on the left frame, on or about 10/2/17.