Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1263114.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,467.00
Current Penalty: $3,000.00
Issuance Date: 03/02/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 03/23/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/23/2018 | $3,000.00 | Serious | ||
Penalty | Z: Issued | 03/02/2018 | $6,467.00 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Location: Facility On or about September 12, 2017, the employer did not develop and utilize energy control procedures to protect employees from the unexpected start up and amputation hazards from performing maintenance and servicing to the following but not limited to machines; 1. Applied Recovery Systems Puck Master 2. Mazak Integrex e-1060V/8 II 3 and 4. Fanuc small robot area - two Mazak Integrex 100