Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1260208.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $11,408.00
Current Penalty: $9,286.00
Issuance Date: 11/14/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0215000
Contest Date: 12/15/2017
Final Order: 10/22/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/22/2018 | $9,286.00 | Serious | ||
Penalty | C: Contested | 12/15/2017 | $11,408.00 | Serious | ||
Penalty | Z: Issued | 11/14/2017 | $11,408.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports. a) Exterior supported scaffold on the 2nd floor roof courtyard of 156 North 4th Street, Brooklyn, NY: Employees were manually hoisting a gang box from the frames, cross braces, and planks of a 5-tier high supported scaffold. Each platform which employees worked on was not fully planked or decked between the front uprights and the guardrail supports. On or about 08/24/17.