Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1256912.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 02/22/2018 2
Initial Penalty: $9,147.00
Current Penalty: $4,573.50
Issuance Date: 02/15/2018
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 5
Report ID: 0111700
Contest Date: 03/13/2018
Final Order: 05/11/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/11/2018 | $4,573.50 | 02/22/2018 | Serious | |
Penalty | C: Contested | 03/21/2018 | $9,147.00 | 02/22/2018 | Serious | |
Penalty | Z: Issued | 02/15/2018 | $9,147.00 | 02/22/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: Between the gasket/packer department and end of production line- Employees were not protected from fire and entrapment hazards where a marked exit door discharging to the exterior steel storage area was locked and unable to be opened.