Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1252926.015
Citation: 01004
Citation Type: Serious
Abatement Date: 04/04/2019 2
Initial Penalty: $10,163.00
Current Penalty: $6,500.00
Issuance Date: 01/19/2018
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date: 02/12/2018
Final Order: 03/14/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/14/2019 | $6,500.00 | 04/04/2019 | Serious | |
Penalty | C: Contested | 02/15/2018 | $10,163.00 | 03/08/2018 | Serious | |
Penalty | Z: Issued | 01/19/2018 | $10,163.00 | 03/08/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. On or about 8/1/17, at the Gainesville, Georgia facility, the employer had not performed a periodic inspection to include specific written procedures and a review with Authorized employees at the facility.