Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1252869.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/21/2018 2
Initial Penalty: $7,391.00
Current Penalty: $7,391.00
Issuance Date: 02/01/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0626700
Contest Date:
Final Order: 02/13/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/13/2018 | $7,391.00 | 03/21/2018 | Serious | |
Penalty | Z: Issued | 02/01/2018 | $7,391.00 | 03/21/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process This violation was most recently observed on or about August 3, 2017, in the VPS #2 process unit when the employer failed to ensure the Process Safety Information (PSI) such as Piping & Instruments Diagrams (P&ID) were updated and accurate. There was a discrepancy on the diagram depicting the process water piping connected to the Atmospheric Condensers EX001 and EX005.