Violation Detail
Standard Cited: 19100036 G01 Design and construction requirements for exit routes.
This violation item has been deleted.
Inspection Nr: 1245573.015
Citation: 01001
Citation Type: Serious
Abatement Date: 02/06/2018
Initial Penalty: $7,696.00
Current Penalty: $0.00
Issuance Date: 12/14/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0111400
Contest Date: 02/08/2018
Final Order: 03/04/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/04/2019 | $0.00 | 02/06/2018 | Serious | |
Penalty | C: Contested | 03/07/2018 | $7,696.00 | 02/06/2018 | Serious | |
Penalty | Z: Issued | 12/14/2017 | $7,696.00 | 02/06/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(g)(1): The ceiling of an exit route was not at least seven feet six inches (2.3 m) high. Location: Shaker Tunnel, rear exit The rear exit consisted of an approximately 4 foot diameter tube that would not allow employees using the exit to stand upright.