Violation Detail
Standard Cited: 19100303 G01 I A General.
Inspection Nr: 1230254.015
Citation: 01001D
Citation Type: Serious
Abatement Date: 04/03/2018 2
Initial Penalty: $7,967.00
Current Penalty: $0.00
Issuance Date: 09/13/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): C
Gravity: 5
Report ID: 0213100
Contest Date: 10/03/2017
Final Order: 03/16/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/16/2018 | $0.00 | 04/03/2018 | Serious | |
Penalty | C: Contested | 10/04/2017 | $7,967.00 | 09/25/2017 | Serious | |
Penalty | Z: Issued | 09/13/2017 | $7,967.00 | 09/25/2017 | Serious |
Text For Citation: 01 Item/Group: 001D Hazard:
29 CFR 1910.303(g)(1)(i)(A): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the live parts where they were exposed or from the enclosure front or opening where they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910: A) Repack Area - On or about May 2, 2017, the area in front of electrical equipment including but not limited to: DM-1/Repack MCC, and Repack MCC-55-D-700, was not kept clear. Labeling on the equipment indicated that it was 480 V. Per Table S-1, this equipment needed 36 inches of clearance in front of the equipment. Scrap insulation was piled in front of the equipment.