Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1227862.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 09/29/2017 2
Initial Penalty: $3,803.00
Current Penalty: $2,300.00
Issuance Date: 08/29/2017
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 09/22/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/22/2017 | $2,300.00 | 09/29/2017 | Serious | |
Penalty | Z: Issued | 08/29/2017 | $3,803.00 | 09/11/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauges, audible alarms or pressure activated devices installed in paint spray booths to indicate or ensure that the required air speed was maintained and the average air speed over the open face of the paint spray booth was less than 100 linear feet per minute: (a) There was no gauge or other device installed on the paint booth to indicate air velocity. (b) The air velocity inside the paint booth was less than 100 feet per minute and was measured to be 69 feet per minute.