Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1225377.015
Citation: 01001
Citation Type: Serious
Abatement Date: 11/09/2017 2
Initial Penalty: $2,716.00
Current Penalty: $2,444.40
Issuance Date: 10/05/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0214700
Contest Date:
Final Order: 11/02/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/02/2017 | $2,444.40 | 11/09/2017 | Serious | |
Penalty | Z: Issued | 10/05/2017 | $2,716.00 | 10/12/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Worksite- 10 Pleasant Lane, Oyster Bay, NY- Employees were working at the 15' level of a scaffold installing brick veneer to the exterior of a residence. The scaffold level they were working on had five planks installed. One plank was missing; on or about 04/13/17. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.