Violation Detail
Standard Cited: 19260850 G Preparatory operations.
Inspection Nr: 1211686.015
Citation: 01002
Citation Type: Serious
Abatement Date: 08/07/2017 2
Initial Penalty: $2,716.00
Current Penalty: $2,500.00
Issuance Date: 07/19/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0418600
Contest Date:
Final Order: 08/18/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/18/2017 | $2,500.00 | 08/07/2017 | Serious | |
Penalty | Z: Issued | 07/19/2017 | $2,716.00 | 08/07/2017 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(g): Wall openings in a structure being demolished were not protected to a height of approximately 42 inches: a) Five Story Building: On or about February 14, 2017 and at times prior thereto, the employer did not ensure guardrail systems or an equivalent fall protection method was provided and used on each level of the building where the exterior brick wall was removed which exposed employees to falls up to fifty four feet to the ground below.