Violation Detail
Standard Cited: 19100305 B01 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1185052.015
Citation: 01002
Citation Type: Serious
Abatement Date: 11/22/2016 2
Initial Penalty: $5,345.00
Current Penalty: $3,742.00
Issuance Date: 10/26/2016
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0728500
Contest Date:
Final Order: 11/16/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/16/2016 | $3,742.00 | 11/22/2016 | Serious | |
Penalty | Z: Issued | 10/26/2016 | $5,345.00 | 11/22/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.305(b)(1)(i): Conductors entering cutout boxes, cabinets, or fittings were not protected from abrasions: (a) An electrical connection on the Parke V-Pak hydraulic reservoir had come loose and subjected energized conductors to abrasion. The employer provided photo evidence of the electrical fitting being repaired and the correction of the hazard.