Violation Detail
Standard Cited: 19260602 D Material handling equipment.
Inspection Nr: 1181934.015
Citation: 01003
Citation Type: Willful
Abatement Date: 01/30/2017 7
Initial Penalty: $54,872.00
Current Penalty: $54,872.00
Issuance Date: 01/03/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0213900
Contest Date:
Final Order: 03/08/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 01/03/2017 | $54,872.00 | 01/30/2017 | Willful |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.602(d): The employer did not ensure that each employee operating a powered industrial vehicle had been trained and evaluated as required by paragraph 29 CFR 1910.178(l):Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178. and as referenced by the note contained in 1926.602(d). a) 11 Pondview Court, Evesham, NJ: On or about 10/05/2016 two Station Builders Inc. employees were conducting roof sheathing activities on a two story new construction residential structure. The employees used a Pettibone T8044 Rough Terrain Fork Lift used to elevate the stack of roof sheathing without being properly trained and certified. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.