Violation Detail
Standard Cited: 19100147 D05 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1176026.015
Citation: 01001B
Citation Type: Other
Abatement Date: 11/30/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/09/2016
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0626600
Contest Date:
Final Order: 12/15/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/15/2016 | $0.00 | 11/30/2016 | Other | |
Penalty | Z: Issued | 11/09/2016 | $0.00 | 11/30/2016 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d)(5)(ii): Where there was a possibility of re-accumulation of stored energy to a hazardous level, verification of isolation was not continued until the servicing or maintenance was completed, or until the possibility of such accumulation no longer exist. On or about September 06, 2016, and at times prior thereto, employees working in Unit #3 were exposed to thermal burn and struck-by hazards, while working, servicing and cleaning a boiler with the possibility of re-accumulation of stored energy to a hazardous level without a continued verification of the isolation or until the possibility of such accumulation no longer exist.