Violation Detail
Standard Cited: 19260454 C03 Training requirements.
Inspection Nr: 1172849.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 12/02/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/04/2016
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 1032500
Contest Date:
Final Order: 12/02/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/02/2016 | $0.00 | 12/02/2016 | Serious | |
Penalty | Z: Issued | 11/04/2016 | $0.00 | 12/02/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.454(c)(3): Inadequacies in an employee's work involving scaffolds indicates that the employee has not retained the requisite proficiency. (a) On or about August 15, 2016, an employee demonstrated lack of understanding of the requirement to don a personal fall arrest system when working at elevated heights and was observed working in a Genie S-40 aerial lift. Note: Abatement certification IS required for this item.