Violation Detail
Standard Cited: 19260451 A06 General requirements.
Inspection Nr: 1163855.015
Citation: 01001
Citation Type: Serious
Abatement Date: 02/01/2017 7
Initial Penalty: $6,338.00
Current Penalty: $3,600.00
Issuance Date: 01/20/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0215000
Contest Date: 02/09/2017
Final Order: 02/07/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/07/2018 | $3,600.00 | 02/01/2017 | Serious | |
Penalty | C: Contested | 02/13/2017 | $6,338.00 | 02/01/2017 | Serious | |
Penalty | Z: Issued | 01/20/2017 | $6,338.00 | 02/01/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(a)(6): Scaffolds were not designed by a qualified person. On or about 7/21/16 Location: 475 Lock St. Brooklyn NY11239 a) Employees worked on a elevated platform which wsa not designed by a qualified person.