Violation Detail
Standard Cited: 19100024 F Step bolts and manhole steps.
Inspection Nr: 1163153.015
Citation: 02005
Citation Type: Serious
Abatement Date: 01/20/2017 2
Initial Penalty: $3,741.00
Current Penalty: $2,244.00
Issuance Date: 12/22/2016
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): C
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 01/17/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/17/2017 | $2,244.00 | 01/20/2017 | Serious | |
Penalty | Z: Issued | 12/22/2016 | $3,741.00 | 01/20/2017 | Serious |
Text For Citation: 02 Item/Group: 005 Hazard:
29 CFR 1910.24(f): Rise height and tread width were not uniform throughout any flight of stairs including any foundation structure used as one or more treads of the stairs: On or about July 19, 2016, employees were exposed to tripping and fall hazards on the densifier steps when the rise from the floor to the first step was approximately 10", the rise from the first step to the second step was approximately 12", and the rise from the second step to the third step was approximately 10". In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).