Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1156597.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,236.00
Current Penalty: $4,500.00
Issuance Date: 12/07/2016
Nr Instances: 1
Nr Exposed: 80
Related Event Code (REC):
Gravity: 5
Report ID: 0418800
Contest Date:
Final Order: 01/04/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/04/2017 | $4,500.00 | Serious | ||
Penalty | Z: Issued | 12/07/2016 | $6,236.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: On or about August 3, 2016, at the above addressed worksite, the employer allowed its employees to work at a jobsite where a designated Exit door had a lock system that required turning a thumb knob to unlock the door before opening.