Violation Detail
Standard Cited: 19100147 C07 III B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1149838.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 09/14/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/18/2016
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 09/19/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/19/2016 | $0.00 | 09/14/2016 | Serious | |
Penalty | Z: Issued | 08/18/2016 | $0.00 | 09/14/2016 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(c)(7)(iii)(B): Additional retraining was not provided whenever a periodic inspection under 29 CFR 1910.147(c)(6) revealed that there were deviations from or inadequacies in the employee's knowledge or use of the energy control procedures: a) On or about 05/20/2016 - Millroom; Holtec Saw and Presses; Retraining needed for employees participating in group lockout/tagout maintenance or repair of equipment or machinery. Each employee performing and/or assisting with the maintenance or repair was not applying his/her lockout/tagout devices to the identified energy isolating lockout/tagout points.