Violation Detail
Standard Cited: 19100253 E03 II Oxygen-fuel gas welding and cutting.
Inspection Nr: 1146111.015
Citation: 01013
Citation Type: Serious
Abatement Date: 07/07/2017 2
Initial Penalty: $4,988.00
Current Penalty: $4,286.00
Issuance Date: 10/27/2016
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0215800
Contest Date: 11/10/2016
Final Order: 08/17/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 08/17/2017 | $4,286.00 | 07/07/2017 | Serious | |
Penalty | C: Contested | 11/30/2016 | $4,988.00 | 11/08/2016 | Serious | |
Penalty | Z: Issued | 10/27/2016 | $4,988.00 | 11/08/2016 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1910.253(e)(3)(ii): Approved protective equipment (designated P(F) in Figures Q1, Q2, and Q3) were not installed in fuel gas piping system, such as, but not limited to anti flow back protection: a) On or about 6/7/2016, Back Pod Area: An oxy acetylene torch was used without a back flow preventer. Abatement certification is required for these items.