Violation Detail
Standard Cited: 19100269 D08 IV Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1145260.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 08/24/2016 2
Initial Penalty: $6,600.00
Current Penalty: $6,600.00
Issuance Date: 07/29/2016
Nr Instances: 1
Nr Exposed: 7
Related Event Code (REC): C
Gravity: 5
Report ID: 0524530
Contest Date: 08/22/2016
Final Order: 02/06/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/06/2017 | $6,600.00 | 08/24/2016 | Serious | |
Penalty | C: Contested | 08/23/2016 | $6,600.00 | 08/24/2016 | Serious | |
Penalty | Z: Issued | 07/29/2016 | $6,600.00 | 08/24/2016 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.269(d)(8)(iv): Whenever outside servicing personnel were to be engaged in activities covered by paragraph (d) of this section, the on-site employer and the outside employer did not inform each other of their respective lockout or tag out procedures, and each employer did not ensure that his or her personnel understand and comply with restrictions and prohibitions of the energy control procedures being used: Between February 29, 2016 and March 1, 2016, seven contractor employees were exposed to slurry while conducting work in a reagent slurry tank, and the employer did not comply with the energy control procedures restrictions concerning removal of employees from tracking sheet for LOTO Permit 7285.