Violation Detail
Standard Cited: 19100269 D07 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1145260.015
Citation: 01002
Citation Type: Serious
Abatement Date: 08/24/2016 2
Initial Penalty: $5,500.00
Current Penalty: $5,500.00
Issuance Date: 07/29/2016
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): C
Gravity: 5
Report ID: 0524530
Contest Date: 08/22/2016
Final Order: 02/06/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/06/2017 | $5,500.00 | 08/24/2016 | Serious | |
Penalty | C: Contested | 08/23/2016 | $5,500.00 | 08/24/2016 | Serious | |
Penalty | Z: Issued | 07/29/2016 | $5,500.00 | 08/24/2016 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(d)(7)(i): Before the releasing lockout/tag out devices, the work area was not inspected to ensure that nonessential items have been removed and that machine or equipment components were operationally intact: On or about May 10, 2016, an employee was exposed to 480 volt current from a feeder when the employer did not inspect the connection to ensure that the feeder line was reconnected to a pump before releasing the lockout/tag out devices for the pump.