Violation Detail
Standard Cited: 19100022 A03 General requirements.
This violation item has been deleted.
Inspection Nr: 1137877.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/27/2016 2
Initial Penalty: $3,000.00
Current Penalty: $0.00
Issuance Date: 06/01/2016
Nr Instances: 5
Nr Exposed: 5
Related Event Code (REC):
Gravity: 1
Report ID: 0729700
Contest Date: 06/27/2016
Final Order: 11/30/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/30/2016 | $0.00 | 06/27/2016 | Serious | |
Penalty | C: Contested | 06/28/2016 | $3,000.00 | 06/27/2016 | Serious | |
Penalty | Z: Issued | 06/01/2016 | $3,000.00 | 06/27/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(3): Every floor, working area, or passageway was not kept free from protruding nails, splinters, holes, or loose boards: Employees engaged in production activities were exposed to slip and trip hazards in that sulfuric acid had corroded the floor and caused the floor to heave. The heaving floor caused the bricks to come loose and resulted in holes in the following locations: a) C-Line Finishing area, crack floor. b) C-Line Charging area, crack floor. c) Travel path area and around work-stations throughout the Formation plant, crack floor. d) Acid Fill area, hole on the floor beside bricks and dyke section. e) Charging/Holding area, hole on the floor in front of float line 4-6. 29 CFR 1903.19(c)(1): Requires certification that the abatement of the above violation is complete.