Standard Cited: 19100269 D02 III Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1134891.015
Citation: 01004
Citation Type: Serious
Abatement Date: 09/28/2016
Initial Penalty: $12,471.00
Current Penalty: $0.00
Issuance Date: 09/01/2016
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0418200
Contest Date:
Final Order: 09/27/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2016 | $0.00 | 09/28/2016 | Serious | |
Penalty | Z: Issued | 09/01/2016 | $12,471.00 | 09/28/2016 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.269(d)(2)(iii): Procedures were not developed, documented, and used for the control of potentially hazardous energy covered by paragraph (d) of this section: a. Plant Bowen - The employer did not specify procedural steps for shutting down, isolating or securing machines and equipment prior to demolishing or removing wires and equipment.