Violation Detail
Standard Cited: 19100269 A04 Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1134884.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 10/20/2016
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/01/2016
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): C
Gravity: 10
Report ID: 0418200
Contest Date:
Final Order: 09/27/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2016 | $0.00 | 10/20/2016 | Serious | |
Penalty | Z: Issued | 09/01/2016 | $0.00 | 10/20/2016 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.269(a)(4): Extent of briefing. Existing characteristics and conditions. Existing characteristics and conditions of electric lines and equipment that are related to the safety of the work to be performed shall be determined before work on or near the lines or equipment is started. Such characteristics and conditions include, but are not limited to: a. Unit 3 Cooling Tower - Georgia Power did not provide Fluor management sufficient information for identifying conductor cables that were energized before the demolition project began. The failure to provide adequate circuitry information prevented the Fluor employee in charge from a briefing transfer of needed information such as the nominal voltage on lines and equipment to be removed during the demolition process.