Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1125762.015
Citation: 01009
Citation Type: Serious
Abatement Date: 08/09/2016 2
Initial Penalty: $5,500.00
Current Penalty: $3,000.00
Issuance Date: 08/01/2016
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): C
Gravity: 5
Report ID: 0418600
Contest Date:
Final Order: 08/24/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/24/2016 | $3,000.00 | 08/09/2016 | Serious | |
Penalty | Z: Issued | 08/01/2016 | $5,500.00 | 08/09/2016 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: (a) Water Treatment Pit; On or about February 2, 2016 and at times prior thereto, an employee was exposed to an electrical shock hazard when entering the water treatment pit to replace the sump pump which had burned out. A junction box which contained the electrical wires that provides power to the sump pump did not have a cover.