Violation Detail
Standard Cited: 19100178 F02 Powered industrial trucks.
Inspection Nr: 1121670.015
Citation: 02003
Citation Type: Serious
Abatement Date: 08/10/2016 2
Initial Penalty: $2,100.00
Current Penalty: $2,100.00
Issuance Date: 07/06/2016
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 1
Report ID: 0830500
Contest Date:
Final Order: 07/27/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/27/2016 | $2,100.00 | 08/10/2016 | Serious | |
Penalty | Z: Issued | 07/06/2016 | $2,100.00 | 08/10/2016 | Serious |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.178(f)(2): The storage and handling of liquefied petroleum gas fuel was not in accordance with NFPA 58-1969 "Storage and Handling of Liquefied Petroleum Gases": (a) Nidi Tec Inc, at 591 E 56th Avenue, Denver, CO: On and preceding 1/29/16, Nidi Tec Inc did not ensure that storage and handling of liquefied petroleum gas fuel was in accordance with NFPA 58-1969 "Storage and Handling of Liquefied Petroleum Gases". Employees operated Hyster model S120XL and Yale model GLP060PDNUAE080 powered industrial trucks while transporting granite slabs. The powered industrial trucks were propane fueled. Full and empty propane gas cylinders were stored inside the building, adjacent to the large overhead door which was used by forklift and pedestrian traffic. The employer did not ensure that propane gas cylinders were stored in accordance with NFPA 58-1969. This condition exposed employees to a fire or explosion hazard.