Violation Detail
Standard Cited: 19100217 C01 I Mechanical power presses.
Inspection Nr: 1119019.015
Citation: 01003
Citation Type: Serious
Abatement Date: 06/30/2016 2
Initial Penalty: $5,000.00
Current Penalty: $3,000.00
Issuance Date: 06/10/2016
Nr Instances: 3
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 06/30/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/30/2016 | $3,000.00 | 06/30/2016 | Serious | |
Penalty | Z: Issued | 06/10/2016 | $5,000.00 | 06/30/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es): 1. On or about January 20, 2016, employees were exposed to the 24 inch square side openings of stamping presses number 12 and 13. The two Federal 200 ton mechanical powered presses had side openings that were not guarded. 2. On or about April 11, 2016, employees were exposed to the 29 inch square opening on the east side of stamping press number 1. The Warco 600 ton mechanical powered press side opening was not guarded.