Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1118961.015
Citation: 01003
Citation Type: Serious
Abatement Date: 05/09/2016 2
Initial Penalty: $2,970.00
Current Penalty: $1,485.00
Issuance Date: 04/27/2016
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 1
Report ID: 0215800
Contest Date: 05/20/2016
Final Order: 04/03/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/03/2017 | $1,485.00 | 05/09/2016 | Serious | |
Penalty | C: Contested | 05/20/2016 | $2,970.00 | 05/09/2016 | Serious | |
Penalty | Z: Issued | 04/27/2016 | $2,970.00 | 05/09/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure a) On or about 1/20/2016, Con #5 Area: A temporary power tap was in use with an extension cord in place of a permanent wiring. Abatement certification is required for this item.