Violation Detail
Standard Cited: 19100303 B01 General.
Inspection Nr: 1118961.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 05/09/2016 2
Initial Penalty: $4,950.00
Current Penalty: $2,475.00
Issuance Date: 04/27/2016
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 05/20/2016
Final Order: 04/03/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/03/2017 | $2,475.00 | 05/09/2016 | Serious | |
Penalty | C: Contested | 05/20/2016 | $4,950.00 | 05/09/2016 | Serious | |
Penalty | Z: Issued | 04/27/2016 | $4,950.00 | 05/09/2016 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) On or about 1/20/2016, Line #15 Area: The main power control box had a broken on/ off switch which had been bypassed. Abatement certification is required for this item.