Violation Detail
Standard Cited: 19100107 C09 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1118458.015
Citation: 01006
Citation Type: Serious
Abatement Date: 08/09/2016 2
Initial Penalty: $6,300.00
Current Penalty: $4,380.00
Issuance Date: 06/01/2016
Nr Instances: 6
Nr Exposed: 20
Related Event Code (REC):
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 06/23/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/23/2016 | $4,380.00 | 08/09/2016 | Serious | |
Penalty | Z: Issued | 06/01/2016 | $6,300.00 | 06/09/2016 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.107(c)(9)(i): All metal parts of spray booths, exhaust ducts, and piping systems conveying flammable liquids or liquids with a flashpoint greater than 199.4 °F (93 °C) or aerated solids were not properly electrically grounded in an effective and permanent manner: (a) R & D - On or about January 27, 2016 Magnum Venus Paint (MVP) sprayers and chopper sprayers were not grounded. (b) Lamination - On or about January 27, 2016 the Magnum Venus Paint (MVP) sprayers and chopper sprayers were not grounded. (c) Offshore - On or about January 27, 2016 the Magnum Venus Paint (MVP) sprayers and chopper sprayers were not grounded.