Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1118111.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,600.00
Current Penalty: $3,000.00
Issuance Date: 07/14/2016
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC): C
Gravity: 5
Report ID: 0418800
Contest Date: 08/02/2016
Final Order: 01/05/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 01/05/2017 | $3,000.00 | Serious | ||
Penalty | C: Contested | 10/12/2016 | $6,600.00 | Serious | ||
Penalty | Z: Issued | 07/14/2016 | $6,600.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) On or about 01/15/2016, at the above addressed location, The gate door leading to the exit on the loading dock was locked with a padlock. b) On or about 03/28/2016, at the above addressed location, The gate door leading from the receiving area to the showroom exit was locked with a padlock.