Violation Detail
Standard Cited: 19100269 V10 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1115505.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/08/2016 2
Initial Penalty: $5,500.00
Current Penalty: $5,500.00
Issuance Date: 05/12/2016
Nr Instances: 1
Nr Exposed: 493
Related Event Code (REC):
Gravity: 5
Report ID: 0213900
Contest Date:
Final Order: 06/14/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 05/12/2016 | $5,500.00 | 06/08/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(v)(10)(i): Smoking and other ignition sources were not prohibited near hydrogen or hydrogen sealing systems, and signs warning of the danger of explosion were not posted: a) Turbine building elevation 102: A power strip and extension cord used to power a purity meter that could have served as an ignition sources and were located next to the hydrogen control panel were not class I division II, on or about, 1/4/16 NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.