Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1110296.015
Citation: 02006
Citation Type: Other
Abatement Date: 03/14/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/24/2016
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0316100
Contest Date: 03/21/2016
Final Order: 08/04/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/04/2016 | $0.00 | 03/14/2016 | Other | |
Penalty | C: Contested | 04/22/2016 | $0.00 | 03/14/2016 | Other | |
Penalty | Z: Issued | 02/24/2016 | $0.00 | 03/14/2016 | Other |
Text For Citation: 02 Item/Group: 006 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: a) On or about November 12, 2015; Laundry room; the employer had the plate missing on a conduit elbow exposing the wire conducts and creating a potential shock hazard. b) On or About November 12, 2015; Laundry room; the employer had an open knock out exposing the conductors to environmental hazards such as but limited to dust (lint). Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.