Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1108487.015
Citation: 02001
Citation Type: Willful
Abatement Date: 3
Initial Penalty: $30,800.00
Current Penalty: $30,800.00
Issuance Date: 05/20/2016
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): I
Gravity: 10
Report ID: 0317300
Contest Date: 05/27/2016
Final Order: 03/13/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | W: Empr Withdrew | 03/13/2017 | $30,800.00 | Willful | ||
Penalty | C: Contested | 06/01/2016 | $30,800.00 | Willful | ||
Penalty | Z: Issued | 05/20/2016 | $30,800.00 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights. a) Route 40 and Salem Church Road, Bear, DE - The employer does not ensure that each supported scaffold working level is fully planked between the platform and the uprights. This continuing violation was most recently observed on November 25, 2015, when employees performing stucco application did not have fully planked working surfaces. The employer's ongoing obligation is to ensure that all tubular welded frame scaffolding working levels are fully planked between the platform and the uprights.