Violation Detail
Standard Cited: 19100219 E03 I Mechanical power-transmission apparatus.
Inspection Nr: 1103477.015
Citation: 01003B
Citation Type: Other
Abatement Date: 05/04/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/08/2016
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0316700
Contest Date: 05/02/2016
Final Order: 09/14/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/14/2016 | $0.00 | 05/04/2016 | Other | |
Penalty | C: Contested | 05/09/2016 | $0.00 | 05/04/2016 | Serious | |
Penalty | Z: Issued | 04/08/2016 | $0.00 | 05/04/2016 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.219(e)(3)(i): Vertical or inclined belts were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o) of this section a) AC Unit #10; Rooftop - The inclined belt for the motor that runs the fan was not guarded, exposing employees to in-running nip points and caught-in hazards, on or about October 27, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.