Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1103477.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 05/04/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/08/2016
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC): R
Gravity: 5
Report ID: 0316700
Contest Date: 05/02/2016
Final Order: 09/14/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/14/2016 | $0.00 | 05/04/2016 | Serious | |
Penalty | C: Contested | 05/09/2016 | $0.00 | 05/04/2016 | Serious | |
Penalty | Z: Issued | 04/08/2016 | $0.00 | 05/04/2016 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: a) AC Unit #10; Rooftop - An employee entered a Trane air handler to perform troubleshooting and the 480v disconnect switch was pulled to its off position however a lock out device was not placed on the switch, on or about October 27, 2015. b) AC Unit #10; Rooftop - An employee entered a Trane air handler to perform troubleshooting and neither the fan impeller nor motor drive sheaves were secured to restrict rotational movement, on or about October 27, 2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.