Violation Detail
Standard Cited: 19100217 C01 I Mechanical power presses.
Inspection Nr: 1095766.015
Citation: 01007
Citation Type: Serious
Abatement Date: 04/18/2016 2
Initial Penalty: $4,500.00
Current Penalty: $3,500.00
Issuance Date: 03/23/2016
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 04/18/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/18/2016 | $3,500.00 | 04/18/2016 | Serious | |
Penalty | Z: Issued | 03/23/2016 | $4,500.00 | 04/18/2016 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es). On 10/1/15, in the Radial Press area, the employer did not install guards that protected to point of operation according to the standard Table O-10). Instances included: a - Radial Press 7 - Infeed Opening - 7 in (w) x 4.6 in (h) x 15 in to point of operation b - Radial Press 3 - Out feed Opening - 24 in wide x 6 in (h) x 21 in to point of operation