Violation Detail
Standard Cited: 19100178 L02 II Powered industrial trucks.
Inspection Nr: 1088724.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 03/14/2016 2
Initial Penalty: $7,000.00
Current Penalty: $5,250.00
Issuance Date: 02/17/2016
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 03/01/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/01/2016 | $5,250.00 | 03/14/2016 | Serious | |
Penalty | Z: Issued | 02/17/2016 | $7,000.00 | 03/14/2016 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.178(l)(2)(ii): The employer did not ensure that each operator had successfully completed the training consisting of a combination of formal instruction (e.g., lecture, discussion, interactive computer learning, video tape, written material), practical training (demonstrations performed by the trainer and practical exercises performed by the trainee), and evaluation of the operator's performance in the workplace: (a) Dayton Parts LLC1300 North Cameron Street warehouse - The employer did not ensure that each employee completed training related to the Hubtex side lift forklift using formal instruction, lecture, discussion, interactive computer learning, video tape, written material, on or about August 31, 2015. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.