Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1057798.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/08/2015 2
Initial Penalty: $5,500.00
Current Penalty: $5,500.00
Issuance Date: 06/23/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0627100
Contest Date: 08/17/2015
Final Order: 09/28/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/28/2015 | $5,500.00 | 07/08/2015 | Serious | |
Penalty | C: Contested | 09/21/2015 | $5,500.00 | 07/08/2015 | Serious | |
Penalty | Z: Issued | 06/23/2015 | $5,500.00 | 07/08/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(d)(2): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment: Before servicing the Brehm #1, employees did not deenergize the machine nor perform lockout/tagout using established procedures, exposing employee's to caught-in hazards.