Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1050814.015
Citation: 03001
Citation Type: Other
Abatement Date: 10/05/2015 2
Initial Penalty: $900.00
Current Penalty: $630.00
Issuance Date: 09/28/2015
Nr Instances: 3
Nr Exposed: 25
Related Event Code (REC):
Gravity:
Report ID: 0523100
Contest Date:
Final Order: 10/19/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/19/2015 | $630.00 | 10/05/2015 | Other | |
Penalty | Z: Issued | 09/28/2015 | $900.00 | 10/05/2015 | Other |
Text For Citation: 03 Item/Group: 001 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: (a) On or about March 31, 2015, in the fabrication shop, the employer did not ensure that strain relief was installed in order to prevent the separation of cord from the remote control switch on the wall crane #1097. Employees were exposed to electrical hazards. (b) On or about March 31, 2015, on the dry dock, the employer did not ensure that strain relief was installed in order to prevent the separation from the dead man switch cable in the condor boom lift. Employees were exposed to electrical hazards. (c) On or about March 31, 2014, on the dry dock, the employer did not ensure that strain relief was installed in order to prevent the separation of the fittings on the fan cable at the confined space access. Employees were exposed to electrical hazards.