Violation Detail
Standard Cited: 19100217 D09 I Mechanical power presses.
Inspection Nr: 1044433.015
Citation: 01008
Citation Type: Serious
Abatement Date: 09/30/2015 2
Initial Penalty: $4,900.00
Current Penalty: $2,450.00
Issuance Date: 08/13/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 08/28/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/28/2015 | $2,450.00 | 09/30/2015 | Serious | |
Penalty | Z: Issued | 08/13/2015 | $4,900.00 | 08/24/2015 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.217(d)(9)(i): The employer did not establish a diesetting procedure that will insure compliance with paragraph (c) of this section. a. Tiffin Metal Products Co. located in Tiffin Ohio: On or about March 12, 2015, the employer did not ensure die setting procedures were established for the 60 ton Garco Machinery Company full revolution mechanical power press located in the Building #2 welding department.