Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1044433.015
Citation: 01001
Citation Type: Serious
Abatement Date: 08/24/2015 2
Initial Penalty: $3,500.00
Current Penalty: $1,750.00
Issuance Date: 08/13/2015
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 08/28/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/28/2015 | $1,750.00 | 08/24/2015 | Serious | |
Penalty | Z: Issued | 08/13/2015 | $3,500.00 | 08/24/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in the activities covered by this section. a. Tiffin Metal Products Co. located in Tiffin Ohio: On or about March 6, 2015 the employer failed to ensure energy control procedures were developed for the 60 ton full revolution Garco mechanical power press located in the Building #2 welding department.