Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 1042897.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/02/2015 2
Initial Penalty: $6,300.00
Current Penalty: $6,300.00
Issuance Date: 03/09/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0253420
Contest Date:
Final Order: 03/27/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/09/2015 | $6,300.00 | 04/02/2015 | Serious |