Violation Detail
Standard Cited: 19100022 A02 General requirements.
Inspection Nr: 1042557.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/17/2015 6
Initial Penalty: $2,100.00
Current Penalty: $2,100.00
Issuance Date: 04/07/2015
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC): C
Gravity: 1
Report ID: 1032500
Contest Date: 05/01/2015
Final Order: 11/09/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/09/2015 | $2,100.00 | 04/17/2015 | Serious | |
Penalty | C: Contested | 05/11/2015 | $2,100.00 | 04/17/2015 | Serious | |
Penalty | Z: Issued | 04/07/2015 | $2,100.00 | 04/17/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(2): The floor of every workroom was not maintained in a clean and, so far as possible, a dry condition. Where wet processes are used, drainage was not maintained. a) At EPS molding/press machine #5, On Feb. 25, 2015, and at times prior thereto, the floor where the product is discharged was wet and had no provision for draining the water away . b) At EPS molding/press machine #5, On Feb. 25, 2015, and at times prior thereto, the floor where the hydraulic pump system was wet and had no provision for draining the oil and water from water and leaking hydraulic oil causing the floor to be very slippery. Note: Abatement certification IS required for this item.