Violation Detail
Standard Cited: 19100147 C07 III A The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1040840.015
Citation: 01003
Citation Type: Serious
Abatement Date: 08/24/2015
Initial Penalty: $6,300.00
Current Penalty: $0.00
Issuance Date: 08/12/2015
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 09/01/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/01/2015 | $0.00 | 08/24/2015 | Serious | |
Penalty | Z: Issued | 08/12/2015 | $6,300.00 | 08/24/2015 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(7)(iii)(A): Retraining was not provided for authorized and affected employees when there was a change in their job assignments, a change in machines, equipment or processes that presented a new hazard, or when there was a change in the (a) Affected employees were not trained when there was a change in their job duties which included the servicing of the Quick Cup machine.