Violation Detail
Standard Cited: 19100036 G01 Design and construction requirements for exit routes.
Inspection Nr: 1037474.015
Citation: 01004
Citation Type: Serious
Abatement Date: 11/27/2015 2
Initial Penalty: $3,500.00
Current Penalty: $2,100.00
Issuance Date: 08/04/2015
Nr Instances: 2
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0214200
Contest Date:
Final Order: 08/20/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/20/2015 | $2,100.00 | 11/27/2015 | Serious | |
Penalty | Z: Issued | 08/04/2015 | $3,500.00 | 08/28/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.36(g)(1): The ceiling of an exit route was not at least seven feet six inches (2.3 m) high: Workplace, 142 Frelinghuysen Ave, Newark, NJ a) Workers in the Aluminum Can Picking Line Station have one of two egress pathways under a recycling plastics materials hopper and eventually to the front of the building and the Stanton St. refuge area. The recycling materials hopper South projection limits the height of this egress to approximately 4 1/2 feet from the ground. b) Workers in the Aluminum Can Picking Line Station, have one of two egress pathways under a recycling materials hopper to the exterior commingled material bays and input hoppers, and then back around the hopper under a second North projection and eventually through the main building to the Stanton St. refuge area. The North recycling plastics hopper projection limits the height of this egress pathway to 4 1/2 feet. Violation occurred on or about 3/19/2015