Violation Detail
Standard Cited: 19100119 E06 Process safety management of highly hazardous chemicals.
Inspection Nr: 1031388.015
Citation: 01006
Citation Type: Serious
Abatement Date: 08/21/2015 2
Initial Penalty: $5,390.00
Current Penalty: $4,312.00
Issuance Date: 08/04/2015
Nr Instances: 2
Nr Exposed: 16
Related Event Code (REC):
Gravity: 10
Report ID: 0418300
Contest Date:
Final Order: 08/31/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/31/2015 | $4,312.00 | 08/21/2015 | Serious | |
Penalty | Z: Issued | 08/04/2015 | $5,390.00 | 08/21/2015 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.119(e)(6): The employer did not update and revalidate by a team meeting the requirements in paragraph (e)(4) of this section, to assure that the process hazard analysis is consistent with the current process, at least every five (5) years after the completion of the initial process hazard analysis: (a) On or about 2/6/15 - at West Side, the process hazard analysis for a PSM covered pyrotechnic process used to manufacture Starmines was not updated and revalidated at least every five (5) years. Since the initial process hazard analysis was validated on 10/06/09, the process has been changed to use the new Hobart mixer. (b) On or about 2/6/15 - at West Side, the process hazard analysis for a PSM covered pyrotechnic process used to manufacture Angel Fire Comets was not updated and revalidated at least every five (5) years. Since the initial process hazard analysis was validated on 10/07/09, the employer had a fire incident 10/2/14 that involved Angel Fire Tracer Comet processing.